Sector Client Project Realisation Status
Agro-food SILLY SA Raw materials production unit for the bakery industry Turnkey project Finalised
Buildings - Tertiary European Commission – Orban New building – R&D offices Commissioning of all Technics Finalised
Buildings - Tertiary European Commission – PHS Building Technical and environmental audit Finalised
Buildings - Tertiary GDF Suez - North-Light New building – Head Quarter – 14 floors Commissioning of all Technics Finalised
Buildings - Tertiary GSK Head Quarter New building Client assistance for design, installation and commissioning Finalised
Hospital Europa St-Michel, St Elisabeth New Data Center Turnkey Completed
Hospital Europa St-Michel, St Elisabeth Room Climatisation Turnkey Completed
Hospital Europa St-Michel, St Elisabeth New geriatric dpt HVAC installation and sanitary On-going
Hospital Europa St-Michel, St Elisabeth Cold rooms revamping Maintenance On-going
Hospitals Hospital Erasmus Brussels – Pfizer Clinical Unit Cytostatics handling sector Turnkey project On-going
Hospitals Hospital ZNA Midelheim “In vitro” fertilisation section Turnkey project On-going
Laboratories APB (Association Pharmaceutique Belge) Revamping class B rooms HVAC Revamping On-going
Pharma Aseptic Technologies Production unit Design Finalised
Pharma Besins healthcare Collection and sampling unit Study & HVAC Completed
Pharma Besins healthcare Gel tubes filling unit. Study and implementation. Turnkey project Completed
Pharma Cenexi (ex Thissen Labo) Clean rooms referbushing Assembly of Dagard cleanrooms panels and ceiling On going
Pharma CIM (ULg) New production unit (multiproduct) Concept On-going
Pharma Confidential Vaccines production Basic Design Detail design Completed
Pharma ORTHOFOOD Brussels - Belgium Dry areas Turnkey project Completed
Pharma Pfizer L-L-N P2012 – New production Unit BSL3 Ductings assembly Completed
Pharma Pfizer L-L-N P2012 – Isolator HVAc and black piping feeding isolators and VHP lock Completed
Pharma Pfizer L-L-N P2012 – Isolator HVAc and black piping feeding isolators and VHP lock Completed
Pharma Pfizer L-L-N Multipurpose area (Media, Formulation) Turnkey project On going
Pharma SANOFI PASTEUR - Belgium Vaccines production Supplying and assembly of a pharmaceutical refrigerated room Completed
Pharma UCB Braine Weighing room for new biotech products Turnkey project GMP Certified
Pharma Biotech Bone Therapeutics Isolator interfaces Clean rooms, HVAC and electricity design and construct for new isolator. Room customization On going
Pharma Biotech Bone Therapeutics SA Production unit Turnkey project Finalised
Pharma Biotech CARDIO 3 BMS - Belgium Cell therapy pilot unit area Turnkey project Completed
Pharma Biotech CARDIO 3 BMS - Belgium QC & R&D lab renovation Study Completed
Pharma Biotech CARDIO 3 BMS - Belgium Human tissues bank creation Turnkey project Completed
Pharma Biotech GSK Bio Vaccines New Quality Control Facility (W21 – QC) Client assistance for design, installation and qualification : HVAC, black piping, offices and laboratories Completed
Pharma Biotech GSK Bio Vaccines New Life Viral Vaccine production Unit – BSL1/BSL3 Client assistance for design, installation and qualification : HVAC and black piping Completed
Pharma Biotech GSK Bio Vaccines New Industrialisation Unit Client assistance for design, installation and qualification : HVAC and black piping Completed
Pharma Biotech GSK Bio Vaccines Clinical production unit Conceptual design On going
Pharma Biotech MaSTherCell New Production Unit Turnkey project Finalised
Pharma Biotech Promethera Biosciences Cell Therapy Production Unit Turnkey project Completed
4989B0 Promethera Biosciences Mobile production unit Turnkey project.
Nominee to 2013 Industrie Awards
Best Manufacturing practice
4989B0
Pharma Biotech Promethera Biosciences Bulk production facility Turnkey Finalised